First data after connecting the devices

15.02.2023

The commissioning of the installation has not yet been carried out and we can already see the first interesting data. We only have a blue color curve, which corresponds to the energy that could be delivered by the SFV modules.

As there is not yet production, there is no dark gray curve that would indicate the energy that is actually being produced.

The power of the panels that are in the fixed structure reaches 849W at 13h in the month of January, of the 1010W that could be produced by specifications.

Despite being a day with clear skies, there is an event that occurs periodically from 2pm.

Thanks to having digitized the behavior at the module level, we will be able to know what is happening without having to physically travel to the installation.